Skip to content
ProductsAirport operations
StandPlanby AVIONIQX

Every stand, gate, counter and belt, planned in seconds.

Resource planning for airports of 1 to 10 million passengers: seasonal and day-of-ops allocation of stands, gates, check-in counters and baggage belts, with an A-CDM milestone board.

Published price
€3,000per airport per month
Example
1 airport up to 5M passengers → €3,000 / month
Pilot
4–6 weeks · €10,000 · credited
Includes
Seasonal and day-of-ops allocation of stands, gates, counters and belts; A-CDM board.
Contract
Monthly, 12-month minimum after the pilot
StandPlanDemoOTP · Day of operations09:12:00Z
Visits today
186
31 airlines
Allocation conflicts
0
after 3 changes since 06:00Z
Towing moves
4
−3 vs the seasonal plan
Peak check-in counters
22
07:00–08:00Z
Stands · Tue 03 Nov
TUE 03 NOV
04:00
05:00
06:00
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
09:12Z
Contact stands
S01Code C · bridge
S02Code C · bridge
S03Code C · bridge
S04Code E · bridge
Remote stands
R21Code C · bus
R22Code C · bus
R23Code E · bus
AX 231 A21N
AX 301 A20N
DX 3141 A21N
AX 412 A21N
CQ 1023 B38M
AX 552 A20N
AX 117 A20N
CQ 305 E295
LB 1655 A320
GM 219 A332
LB 1043 A21N
AX 811 AT76
AX 821 AT76
AX 831 AT76
DX 3101 A320
AX 640 A20N

Demo data: a fictional operator at real airports with real aircraft types.

What it does

From the season’s SSIM file to every stand, gate, counter and belt.

01
Seasonal plan
Import the season’s SSIM file and get a conflict-free allocation of every stand, gate, counter and belt, with your rules.
02
Day-of-ops replanning
Close a stand, add a diversion or absorb a delay and the day re-plans in seconds, keeping what can stay.
03
A-CDM board
Milestones from TOBT to off-block for every departure, with the TOBT, TSAT and TTOT updates the Network Manager receives.
04
Counters and belts
Check-in counters and baggage belts allocated flight by flight, with the peak the season needs against your fixed counter blocks.
Re-plan the season

Close two stands, add three rotations, re-plan the season.

Works on the apron, a new route, a late slot change: StandPlan re-allocates the whole season in seconds and shows every visit that moved.

Season re-planned: 0 conflicts, 120 visits moved
Stands 9 and 10 closed for six weeks and three daily rotations added: 396 new visits placed in under two seconds. Rolling the old plan forward would leave 1,289 conflicts. Demo airport layout, synthetic schedule.

What changes

Compared with the current plan · demo data
Allocation conflicts after the change
0
Visits moved to another stand
120
Peak check-in counters for the season, against fixed counter blocks
22 (−5)
Rules built in

Your allocation rules and A-CDM, checked on every visit.

Your approved procedures and agreements sit on top: stricter limits, local rules, company policy. Every check names its source.

EASA and EU

CP1 AOP (CP1-listed airports)EUROCONTROL A-CDM milestonesDirective 96/67/EC Art. 16 space and countersICAO aerodrome design codes

FAA and US

FAA TFDM surface dataPart 139 airport certificationGate-use agreements
Against a legacy suite

What changes for your team.

Typical legacy suite
StandPlan
Buying it
A tender for a full AODB suite
A monthly price, beside your AODB
Re-planning the season
Hours in a planning tool
Seconds, with the moves shown
Why a visit got its stand
A colour on a Gantt chart
The rule in words, for every visit
The StandPlan pilot · 4–6 weeks

Pass mark: zero conflicts and 50% less planning effort.

We run in shadow beside what you use today. You get the plan, the measurements and the differences, reviewed with your team every week.

What we need, what you get

Pilot fee: €10,000 · credited
Seasonal schedule (SSIM) and resource list
Week 0
Your allocation rules, captured in one workshop
Week 1
A seasonal plan and shadowed days of operation
Week 4–6

Questions buyers ask

Do we need to replace our AODB?
No. StandPlan reads the schedule from a file or your AODB export and gives the plan back the same way.