ProductsAirline crew
CrewRosterby AVIONIQXCrew rosters that close themselves, legally.
Pairing, rostering and legality for airlines of 10 to 80 aircraft. Import an SSIM schedule and a crew list; get legal pairings and rosters with the reason for every assignment.
Published price
€9per crew member per month
- Example
- 380 crew → €3,420 / month
- Pilot
- 6–8 weeks · €15,000 · credited
- Includes
- Pairing, rostering, legality for EASA and FAA, scenario studies, disruption replay.
- Contract
- Monthly, 12-month minimum after the pilot
Crew legal
248/ 248
Every duty inside ORO.FTL
Hotel nights, November
132
−18 vs the current roster
Deadheads
14
−9 vs the current roster
Weekend-off spread
±1.2
days across captains
Crew · W45
MON 02 NOV
TUE 03 NOV
WED 04 NOV
THU 05 NOV
FRI 06 NOV
SAT 07 NOV
SUN 08 NOV
00:00
12:00
00:00
12:00
00:00
12:00
00:00
12:00
00:00
12:00
00:00
12:00
00:00
12:00
09:12Z
Capt. A. IonescuCP · OTP
Capt. D. GeorgescuCP · OTP
Capt. L. WiśniewskiCP · OTP
F/O R. PopFO · OTP
F/O E. StanFO · OTP
F/O S. DumitruFO · OTP
Capt. M. PopescuCP · CLJ
F/O I. MarinFO · CLJ
Demo data: a fictional operator at real airports with real aircraft types.
What it does
From an SSIM file to a published roster in an afternoon.
01
Pairing optimiser
Legal pairings from your SSIM schedule that minimise crew cost, hotel nights and deadheads, for your bases and rest facilities.
02
Rostering with fairness
Lines built from pairings, leave, training and requests, with fairness on weekends, nights and early starts you can measure.
03
Legality engine
Every duty checked against EASA ORO.FTL and CS FTL.1, or FAA Part 117 and Part 121/135, plus your scheme and agreements, with the reason in words.
04
Disruption replay
Replay a storm day and get legal recovery options in about thirty seconds, ranked by cost and by the number of crew they touch.
Scenario in 60 seconds
“What if we open a base in Cluj in March?”
Change the schedule, a rule or a base and CrewRoster re-plans the season: headcount, hotel nights, deadheads and the duties that become illegal, before anyone signs a lease.
+23 captains and +21 first officers needed from 29 March
Opening CLJ with 4 based A320s: 40 of its 184 duties cannot be flown as legal day trips from Bucharest, and serving Cluj from OTP would cost €72k more every 28 days in hotels, per diem and positioning. Re-planned in under a second on the demo airline.
What changes
Compared with the current plan · demo data
CLJ duties that cannot be legal day trips from OTP
EASA ORO.FTL.205(b)(1) · ORO.FTL.235
40 of 184
Hotels, per diem and positioning saved by basing crews in Cluj
Cost model
€72k / 28 days
Captains needed for S27 with 4 based aircraft
Headcount model
+23
Rules built in
EASA and FAA, checked every time.
Your approved procedures and agreements sit on top: stricter limits, local rules, company policy. Every check names its source.
EASA and EU
ORO.FTL.205 FDPORO.FTL.210 duty limitsORO.FTL.235 restORO.FTL.220 split dutyORO.FTL.225 standbyORO.FTL.230 reserveCS FTL.1.205ORO.FTL.120 FRMFCL.060 recency
FAA and US
14 CFR 117.11 flight time117.13 FDP117.21 reserve117.23 cumulative117.25 restPart 121 subpart RPart 135 subpart FPart 111 pilot records
Against a legacy suite
What changes for your team.
Typical legacy suite
CrewRoster
Time to go live
A multi-year rollout with integration projects
6 to 8 weeks from your files
Price
Not published; licence plus a project
€9 per crew member per month, published
Why an assignment is legal
A score or a rule code
The rule in words, the reference and the margin
What-if studies
A consultant and a week
Sixty seconds, by the planner
Questions in plain words
Not built in; reports by request to IT
Ask, with the records cited
The CrewRoster pilot · 6–8 weeks
Pass mark: zero violations on your own audit.
We run in shadow beside what you use today. You get the plan, the measurements and the differences, reviewed with your team every week.
What we need, what you get
Pilot fee: €15,000 · credited
An SSIM schedule for one month
Or a CSV export of your legs
Week 0
A crew list with qualifications and carry-in hours
Pseudonymised is fine
Week 0
Your approved FTL scheme and agreement clauses
PDF or text
Week 1
Zero violations on your own audit of our roster
Pass mark
Week 6
Crew cost per block hour, hotel nights, deadheads, planning time
Compared side by side
Week 6–8
Questions buyers ask
Does it replace our crew system on day one?
No. It plans in shadow beside it; rosters go back as a file your current system imports, until you decide to switch.
Can it handle our union agreement?
Agreement clauses become rules on top of the regulation: stricter limits, extra rest, seniority and bidding preferences.
Same platform
The rest of the portfolio.
OpsControlby AVIONIQX
Disruption recovery for the operations control centre: tail and crew swaps ranked by cost, with EU261 exposure in euros.
from €190 per aircraft / monthExplore
FuelLedgerby AVIONIQX
ReFuelEU, EU ETS, CORSIA and non-CO₂ reporting, reconciled to every flight, with the fuel savings found along the way.
from €1,000 per operator / monthExplore
StandPlanby AVIONIQX
Stands, gates, check-in counters and belts for regional airports, planned for the season and re-planned in seconds.
from €3,000 per airport / monthExplore